Hello! Welcome to Gongyi Hongsheng Pipeline Equipment Co., Ltd. official website.

Popular searches:

Compensator _ bellows _ compensator _ non-metallic compensator _ rubber compensator _ telescopic _ waterproof casing _ rubber joint _ expansion joint _ skin _ professional custom manufacturers

 

Product Categories
News

巩义市邦盛管道设备有限公司
联系人:贺经理
手机:13523555121
联系人:王经理
手机:13803838882
电话:0371-64031876
传真:0371-69580678
邮箱:13523555121@163.com
邮编:451200
地址:河南巩义市西村镇工业园区

Bypass pressure balance corrugated compensator

You are here:Home > Products > Pressure balance type corrugated compensator > Bypass pressure balance corrugated compensator

Bypass pressure balance corrugated compensator

Bypass pressure balance corrugated compensator

Details

& does relevant recommendations: 【 pipe expansion pipe, can be flexible rubber joint, flexible rubber joint 】 is gongyi city full state pipeline equipment co., LTD. The main business of our company has been made as a special equipment manufacturing license and ISO quality management system certification of qualified companies, the company management concept: the factory in order to "customer needs is our goal" principle, wholeheartedly for the customers with excellent products, reasonable prices, fast delivery cycle, professional technical support and perfect after-sales service. In the future, full state is full of confidence and hope, was determined in a more high quality brand and good service, sincere cooperation with customers at home and abroad, to do the northern area of the thermal compensation smoke duct equipment industry's first brand.



The characteristics of the bypass pressure balance corrugated compensator
Bypass pressure balance corrugated compensator (TPP) has the ability to absorb internal pressure force, has a good guidance, product small rigidity, small overall dimensions, etc.

Bypass the connecting way of pressure balance corrugated compensator
1, 2, to take over the connection flange connection

Bypass pressure balance of corrugated compensator installation instructions
1. The product before the installation, should check, the make and model of the compensator specifications meet the design requirements of the piping.
2. Between two fixed bracket can only install a bypass pressure balance compensator.
3. The strength of the fixed bracket must comply with the design requirements, to ensure that the compensator is not subject to damage; Guide bracket must have enough guidance or influence line displacement.
4. Corrugated compensator are generally do not absorb torque, so do not allow the compensator is torque when installation.
5. The need for "cold" compensator, the prestressing of auxiliary components, should be removed after the compensator predeformation.
6. After the completion of the piping installation shall be immediately removed compensator is used as the install auxiliary positioning and ? transport protection
7. In addition to the design requirements of pretension pressure or "cold" predeformation, corrugated pipe deformation method is strictly prohibited to adjust the pipeline installation deviation, so as not to affect the normal function of the compensator, otherwise it will reduce its service life and increase the piping, equipment and load of support components.
8. The pipe to neutral, in the absence of other methods to ensure, straight cut length after laying pipe can be used again to ensure that the installation of expansion joint method.
9. Insulation should be done outside the compensator cases, shall not adopt any chlorine heat preservation material.
10. The installation process do not allow the slag splash to the corrugated pipe surface or other mechanical damage to bellows.
11. Compensator is allowed no more than 1.5 times the nominal pressure of the system pressure test.
12. The compensator used in the gas medium and its connected pipes, do water pressure test, whether you need to consider when water filling of the compensator to take over the adding temporary support to bearing.
13. Hydrostatic test water must be clean, no corrosion, and control the content of chloride ion in water less than 25 PPM.
14. For products of steam pipe network, water pressure test the back end of the corrugated pipe in the water.
15. Equipped with compensator in the operation of the pipeline, valve opening and closing to gradually, in order to avoid rapid changes in temperature and pressure in the pipeline, causes the damage of stents or compensator.
16. With a hydrophobic device before the second run, in the steam piping network of a compensator of hydrophobic device should be open, row net the condensed water inside the sleeve, and then the hydrophobic device tighten.

Products Navigation
豫ICP备10022100号 Copyright: Gongyi City Bangsheng Pipeline Equipment Co., Ltd. Address: Industrial Park, Xicun Town, Gongyi City, Henan Province

Tel: 0371-64031876 Mobile: 13523555121 Fax: 0371-657080678

Technical Support:Hangzhou Sixi You are73649Visitors